Construction milestones

Track a build stage by stage, from site preparation to handover, with dates, progress, the spend linked to each stage and what is slipping against plan.

Updated 20 Nov 2026

Try it in Property360

Overview

Construction Milestones tracks a building project stage by stage: Site preparation, Excavation, Foundation, Plinth beam, Columns, Slab, Brick work, Plastering, Electrical, Plumbing, Flooring, Painting, Elevation and Handover. Columns, Slab and Brick work repeat per floor, so you can track Slab — Ground floor, Slab — 1st floor and so on. You can also add your own milestones, such as a sump or a compound wall.

Each milestone has a status (Planned, In progress or Done), a planned date, a start date, a completion date, a % complete, an optional planned cost and notes. Expenses can be linked to a milestone, so you see what each stage actually cost.

You see milestones in two places:

  • On each project page, in the Milestones card: progress tiles, a stage timeline and the milestone list.
  • Across all projects in Construction → Construction Milestones, with a Needs attention list of stages that are overdue or due soon but not started.

Before you start

  • The construction project must exist. See Construction expenses.
  • Landlords and supervisors can add and edit milestones and link expenses. Only landlords can delete a milestone.

Steps

Capture a milestone while adding an expense

  1. Open the project and click Add Expense.
  2. Fill in the category, description, amount and other details as usual.
  3. Below Notes, Property360 suggests the stage the expense belongs to, from the category, description, notes and vendor. For example, "TMT steel for 2nd floor slab" suggests Slab — 2nd floor, "Red bricks" suggests Brick work and "Vitrified tiles" suggests Flooring.
  4. Choose one:
    • Link: link the expense to that milestone. If the milestone doesn't exist yet, it is created.
    • Link + mark started: link it and mark the stage in progress from the expense date.
    • Link + mark done: link it and mark the stage done on the expense date.
    • Choose another: pick a different milestone of this project.
    • Not a milestone: save the expense without a link.
  5. Click Add Expense. The expense and the milestone are saved together in one step.

Nothing is linked unless you confirm it. If no suggestion appears, click Link to a milestone to pick one yourself.

Add a milestone on its own

  1. On the project page, click Add milestone in the Milestones card, or click a stage under Quick add.
  2. Choose the Stage (or Custom milestone… and type a name). For a per-floor stage, enter the Floor / level.
  3. Set the Status, Planned date, Start date, % complete or Completion date, an optional Planned cost (₹, optional) and Notes.
  4. Click Add milestone.

Update, complete or delete

  • Click a milestone row, or a stage on the timeline, to edit it.
  • Use the row's ⋮ menu for Mark started today, Mark done today, Re-open or Show linked expenses. A message with Undo appears after each change.
  • Delete shows what will happen before you confirm: the linked expenses are only unlinked, never deleted. Undo restores the milestone and links the same expenses again.

Example

Green Acres Villa is a ground-plus-two building with a ₹85,00,000 budget. The owner adds Foundation (done), Slab — Ground floor (done) and Slab — 1st floor (in progress, planned for 15 Dec 2026). When the supervisor records "TMT steel 12 mm for 1st floor slab" for ₹1,40,000, the form suggests Slab — 1st floor; one click on Link saves both. On 20 Dec the slab is cast, so the next expense, "Centering removal labour", is saved with Link + mark done. The tracker shows Slab — 1st floor as Done late · 5d and its linked spend.

FAQs

How is "slipping vs plan" worked out?

A stage is Overdue when its planned date has passed and it isn't done, and Due soon, not started when it is planned within 7 days and still planned. A stage finished after its planned date shows Done late with the number of days.

What does "Overall progress" mean?

It is the average % complete of all the project's milestones, with done stages counted as 100%.

Can one expense belong to two milestones?

No. Link it to the stage it mostly paid for. Use the project's Milestone filter in the expense list to see each stage's expenses.

Where do material rates go?

Rates per bag, tonne or cubic metre are recorded in Material price trends.

Troubleshooting

The suggestion picks the wrong stage

Click Choose another to pick the right milestone, or Not a milestone. Suggestions are only a guess and are never saved without your confirmation.

"already exists on this project"

Each stage and floor can be added once per project. Edit the existing milestone instead.

I can't see Delete

Only landlords can delete milestones.